New Garage Door Sales and Installation
Day & Night Garage Doors — Complete Garage Replacement
Free In-Person Quote
We provide free, no-obligation, in-person quotes for full garage door replacement. A design consultant will visit your home at a scheduled time to evaluate the existing door, take measurements, and review site conditions.
Next-Day Installations
Next-day installation is available for select garage door models and colors. Availability depends on inventory and delivery schedules; your design consultant will confirm if a next-day install option applies to the door you choose.
The Process — What to Expect
Initial Contact and Appointment
Schedule a free in-person visit. The design consultant confirms measurements and any access requirements.
On-Site Design Consultation
A design consultant comes to your home to:
Assess the existing door, frame, tracks, and surrounding structure.
Discuss functional requirements (insulation, wind rating, budget, frequency of use).
Present door style options, materials, colors, window styles, and hardware choices.
Advise on available glass, panel profiles, and insulation R-values.
Explain opener compatibility and recommend door-and-opener packages if needed.
Real-Life Visualization
Your consultant creates a real-life view of your selected design directly on your home:
Shows style, color, window layout, and hardware placement.
Helps you see how options interact with your home’s exterior before purchase.
Proposal and Scheduling
You receive a written proposal outlining the chosen door, components, price, and installation timeline.
If eligible for next-day installation and you approve, appointment is scheduled accordingly.
What a New Garage Door Includes A full garage door replacement from Day & Night Garage Doors includes all major components required for a complete, safe installation, except the motor (opener), unless you select a door-and-opener package. Components included:
Door panels/sections (assembled and finished per your selected style and color)
Bottom weather seal and section seals
Vertical and horizontal track systems (new tracks included when required by the installation)
Rollers (steel or nylon, per selected package)
Hinges and brackets
Torsion spring system or extension springs (new springs sized and installed to match door weight and balance)
Cables and drums (new cable assemblies)
Top and side seals and threshold options (where applicable)
Hardware required for door operation and attachment
Safety devices and hardware to meet current code (photo eyes, emergency release)
Fasteners and installation materials
Inspection and functional tuning at completion
Motor/Opener Options
The motor/opener is not included automatically; we offer professional recommendations and can bundle a motor/opener with your door. Ask your technician about our door-and-opener package solutions, available opener models, and smart/quiet options.
Day-of-Installation: Step-by-Step
Arrival and Site Preparation
Technicians arrive on time, introduce themselves, review the work order, and confirm access.
Work area is prepared: vehicles moved as needed, floors protected, and safety zones established.
Removal and Disposal
Existing door, tracks, springs, rollers, and related hardware are safely disassembled and removed.
Old door and debris are transported offsite and disposed of according to local regulations. (Recycling when possible.)
Installation of New Components
New tracks, rollers, hinges, springs, cables, and hardware are installed.
Door panels are assembled and mounted to the track system.
Bottom seal and thresholds installed and adjusted for proper weather tightness.
Opener Installation (if selected)
Opener mounted and wired/integrated with the new door according to manufacturer specifications.
Garage door and opener remote controls are programmed.
Safety Devices and Final Adjustments
Photo eye sensors, force settings, and emergency release functions are installed and tested.
Springs and balance are tuned so the door operates smoothly and the manual release functions correctly.
Quieting adjustments and lubrication applied as appropriate.
Clean-Up and Final Walkthrough
Work area is cleaned, and all tools and packaging removed.
Technicians perform a final operational check and safety inspection with the homeowner.
Installation Checklist (what technicians verify and complete)
Site protection in place
Existing door and components removed and disposed
New tracks aligned and secured
Rollers, hinges, and panel fasteners installed per spec
Springs sized and installed correctly (torsion or extension)
Cables properly routed and anchored
Door balanced and counterbalanced correctly
Bottom seal and weatherstripping installed
Photo eyes installed and aligned
Force and travel limits set and tested
Opener installed and programmed (if applicable)

